University of California, Merced 2020 Project Site Boundary Change

25 Documents in Project

Summary

SCH Number
2008041009
Lead Agency
University of California, Merced
Document Title
University of California, Merced 2020 Project Site Boundary Change
Document Type
NOD - Notice of Determination
Received
Posted
8/30/2017
Document Description
Project consists of a boundary change for the Merced 2020 Project site to include the approx. 4.84 acre P3 construction staging and parking area located northeast of the North Bowl parking lot, and exclude a triangular area located between Le Grand Canal and Fairfield Canal and a second triangular located to the east of Fairfield Canal. The project results in a decrease in total site area from 153.4 to 143.7 acres. The boundary change encompasses the alignment of a proposed roadway that would be constructed from the 2020 project site east of the Fairfield Canal to the P3 area. This road will be paved and used to access the P3 area during 2020 project construction, and remain in place as part of the final 2020 Project. The project also relocates portions of a previously installed CA Tier Salamander exclusion fence to align with the modified 2020 Project site boundary. The Project will install the new segment of the CTS fence prior to removing the affected segment of the CTS fence.

Contact Information

Name
Phillip Woods
Agency Name
University of California, Merced
Contact Types
Lead/Public Agency

Location

Cities
Merced
Counties
Merced
Cross Streets
Yosemite Avenue at Lake Road
Zip
95343
State Highways
SR140
Schools
UC Merced
Waterways
Le Grand Canal, Fairfield Canal
Other Location Info
Madera city

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print