Auberge du Soleil No. 2

2 Documents in Project

Summary

SCH Number
2008032098
Lead Agency
City of Santa Rosa
Document Title
Auberge du Soleil No. 2
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2008
Present Land Use
Rural Residential / RR-20 (Rural Residential) / Low Density Residential
Document Description
Subdivide a 1 acre parcel into 7 single-family residences on the newly created lots. The existing residence will remain on proposed Lot 1. The proposal includes a request to rezone the property from Rural Residential (RR-20) to Single-Family Residential (R-1-6). In addition, there is a request for a Conditional Use Permit to allow a small-lot subdivision, with lot sizes ranging from 3,826 square feet to 9,853 square feet. There are 2 proposed residential floor plans, both of which will be 2-story models; the homes will be 1,280 square feet and 1,698 square feet in size. Each unit will also have a 2-car garage. Proposed landscaping includes street trees, and various medium and small shrubs, along with lawn, in the front yards of each residence.

Contact Information

Name
Jessica Jones
Agency Name
City of Santa Rosa
Contact Types
Lead/Public Agency

Location

Cities
Santa Rosa
Counties
Sonoma
Cross Streets
Dennis Lane and Elwin Lane
Zip
95403
Total Acres
1
Parcel #
059-010-012
State Highways
101
Railways
Northwest Pacific
Schools
Jack London, Piner-Olivet, and Schaefer
Waterways
Coffee Creek, Piner Creek

Notice of Determination

Approving Agency
City of Santa Rosa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print