California WaterFix Addendum to the Final EIR
15 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008032062
- Lead Agency
- California Department of Water Resources (DWR)
- Document Title
- California WaterFix Addendum to the Final EIR
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/26/2018
- Present Land Use
- Varies between County
- Document Description
- A NOD was submitted to the State Clearinghouse on July 21, 2017 for the CA WaterFix (CWF) Project. An Addendum was prepared summarizing the CWF project modifications associated with refinements to the transmission line corridors proposed by the Sacramento Municipal Utility District (SMUD) after the CWF Final EIR was certified and NOD was field by DWR. SMUD will be responsible for delivering power to the northern half of CWF project facilities, from just north of Hood, CA on the Sacramento River to Twin Cities Road just west of the I-5. The Addendum describes the current design of the applicable modified CWF Project power features, proposed modifications to those power features (including an explanation of the need for the modifications), the expected benefits of the modifications to the transmission lines, and potential environmental effects as a result of these power related modifications (as compared to the impacts analyzed in the Final EIR).
- Contact Information
-
Emily Bacchini
Sacramento Municipal Utility District
Lead/Public Agency
P.O. Box 15830, HS H201
Sacramento, CA 95852-1830
Phone : (916) 732-6334
Location
- Cities
- Stockton
- Counties
- Contra Costa Sacramento San Joaquin Solano Yolo
Notice of Determination
- Approving Agency
- Sacramento Municipal Utility District
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- https://www.californiawaterfix.com
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.