Yerba Buena Avenue Diversion Pipe Project ED07-114 (300358)
3 Documents in Project
Summary
SCH Number
2008031007
Lead Agency
San Luis Obispo County
Document Title
Yerba Buena Avenue Diversion Pipe Project ED07-114 (300358)
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2008
Present Land Use
Agriculture, Residential Single Family
Document Description
A proposal by San Luis Obispo County Public Works Department to implement drainage to divert storm water flows from an existing drainage system on the south side of SR 58 to Santa Margarita Creek to the north. Construction activities for the proposed project would include the following: (1) installation of a weir structure, concrete headwall at the pipe inlet; (2) open trench installation of ~1,075' of 36" HDPE pipeline; (3) installation of four manholes; (4) construction of a concrete headwall and duck bill outlet at Santa Margarita Creek; and (50 installation of rip rap and revegetation at pipe outlet at Santa Margarita Creek. The project would result in 11,526 square feet of disturbance.
Contact Information
Name
Eric Wier
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Luis Obispo
Cross Streets
Highway 58
Zip
93453
Total Acres
0.25
Parcel #
070-094-003
State Highways
58, 101
Railways
UPRR
Waterways
Santa Margarita Creek
Other Location Info
Community: Santa Margarita
Notice of Determination
Approving Agency
Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes