State Route 140 Ferguson Slide Rock Shed Project (Project) (California Endangered Species Act Incidental Take Permit No. 2081-2014-078-04 (ITP))

16 Documents in Project

Summary

SCH Number
2008011118
Lead Agency
California Department of Transportation, District 6
Document Title
State Route 140 Ferguson Slide Rock Shed Project (Project) (California Endangered Species Act Incidental Take Permit No. 2081-2014-078-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
11/10/2015
Document Description
The project involves the construction of a 700-ft long rock shed along the existing alignment of SR 140 to reestablish two-lane traffic in an area previously impacted by a major rockslide. The rock shed will be a reinforced concrete box structure supported on concrete piles, anchored with tie-backs into the south canyon wall, and supported on the river side by concrete columns. Retaining walls will also be required on the approach ends of the structure. The project will result in impacts up to approximately 3.0 acres of limestone salamander habitat including temporary impacts up to a max of 1.72 acres; the project will permanently remove 1.28 acres of Limestone salamander habitat. The project is expected to result in incidental take of limestone salamander, which is designated as a threatened species under the CESA. The ITP referenced above, as issued by CDFW, authorizes incidental take of species listed under CESA that may occur as a result of project implementation.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
CDFW Central Region
Contact Types
Lead/Public Agency

Location

Counties
Mariposa
Cross Streets
SR 140
State Highways
SR 140
Waterways
Merced River
Other Location Info
City/Nearest Community: El Portal

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes