State Route (SR) 140 Ferguson Slide Talus Removal Completion Project (Streambed Alteration Agreement No. 1600-2020-0020-R4)

16 Documents in Project

Summary

SCH Number
2008011118
Lead Agency
California Department of Transportation, District 10 (DOT)
Document Title
State Route (SR) 140 Ferguson Slide Talus Removal Completion Project (Streambed Alteration Agreement No. 1600-2020-0020-R4)
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2021
Document Description
The Project authorized by this Agreement involves the continued removal of rock talus and debris that sloughed off a steep canyon wall onto the State Route (SR)140 right-of-way during a landslide event prior to 2013. Removal of the talus and debris threatened deposition of the materials into the adjoining Merced River and in 2014 Streambed Alteration Agreement Notification No. 1600-2013-0198-R4 (SAA) was issued. However, work was delayed by another landslide event in 2015 and while work has since resumed, the Project will not be complete by the time the already extended SAA expires in April 2021. The continued removal of the remaining talus and debris from the 0.36-acre Project Area (a 700-foot-long segment of the right-of-way which varies in width but averages between 23 and 24 feet wide) will ultimately expose the original roadway, shoulder backing, and top of the west bank of the Merced River. Coincidentally, the Project will involve work to repair a slope stabilization netting system which exists over portions of the steep canyon wall above the Project Area.

Contact Information

Name
Steve Hulbert
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Counties
Mariposa
Other Location Info
The Project Area constitutes a 700-foot-long segment of the State Route 140 right-of-way where it adjoins, and exists as, the top of the west bank of the Merced River, near post mile 42.0 between the communities of Briceburg and El Portal in Mariposa County, California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print