Franklin Boulevard/Elk Grove Boulevard Intersection Widening and Bus Turnouts Project
3 Documents in Project
Summary
SCH Number
2007112098
Lead Agency
City of Elk Grove
Document Title
Franklin Boulevard/Elk Grove Boulevard Intersection Widening and Bus Turnouts Project
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2009
Present Land Use
Existing land uses surrounding the Franklin Boulevard/Elk Grove Boulevard Intersection include a Raley's shopping center in the southeastern corner of the intersection, single-family residential homes in the northwest corner, a golf course in the northeastern corner, and the Stone Lakes National Wildlife Refuge (SLNWR) in the southwest corner. South of the Raley's shopping center on the eastide of Franklin Boulevard is the engineered Laguna South Channel North Drainage. South of the channel is a partially landscaped corridor approximately 120 feet wide along the entire eastern side of Franklin Boulevard between the Laguna South Channel and Poppy Ridge Road. Single-family residential housing exists east of this corridor along Franklin Boulevard. To the west of the intersection is a Union Pacific Railroad (UPRR) right-of-way overhead structure.
Document Description
The project will widen a portion of Elk Grove Boulevard from 5 lanes to 6 lanes and a portion of Franklin Boulevard from 4 lanes to 6 lanes. This widening would allow for 2 new free right turn lanes on eastbound to southbound Elk Grove Boulevard and 2 bus turnouts on southbound Franklin Boulevard. The project also includes widening of the west side of Franklin Boulevard from just south of the Laguna South Channel, North Drainage culvert approximately 150' to allow for the roadway to taper from 6 through lanes down to 4 lanes.
Contact Information
Name
Marieka Schrader
Agency Name
California Transportation Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Elk Grove
Counties
Sacramento
Cross Streets
Franklin Boulevard and Elk Grove Boulevard
Zip
95758
Total Acres
3
State Highways
I-5
Railways
Union Pacific
Schools
Helen Carr Castello; Stone Lake Elementary Schools
Waterways
Laguna South Channel, North Drainage Culvert
Township
6N
Range
5E
Section
3
Base
MDB&M
Notice of Determination
Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.