Pine Gulch bridge project

3 Documents in Project

Summary

SCH Number
2007102055
Lead Agency
Marin County
Document Title
Pine Gulch bridge project
Document Type
NOD - Notice of Determination
Received
Posted
10/27/2008
Present Land Use
C-ARP-5 (Coastal Agricultural Residential); C-APZ Coastal Agriculture Production
Document Description
The applicant, John Osterweis (Osterweis Ranch), is proposing to abandon/decommission an existing low water crossing and install a new clear span bridge to facilitate vehicular, livestock and pedestrian access from agricultural/residential buildings to adjacent agricultural lands. The proposed project includes the following: removal of two "old" abutment walls (approx. 15ftX8ftX4ft) and associated fill, installation of a new 65ft. bridge and associated abutment walls, as well as various "improvements" to adjacent driveways including placement of gravel. The new bridge is designed to pass a 100 year flood event. Construction activities include excavation of 563 cubic yards of fill, excavation of concrete, demolition debris and other non-soil materials. The project will require the removal of several native trees including one bay laurel and one alder, as well as other native, non-native vegetation in order to facilitate placement of the new abutments and other elements of the project. The applicant has stated that no grading will occur within the wetted area of the stream and that if equipment crossing of the creek is necessary, steel plates or wood mats will be temporarily installed to minimize impacts to the streambed.

Contact Information

Name
Jeremy Sarrow
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Marin
Cross Streets
Paradise Valley Road and Pine Gluch Road
Zip
94924
Total Acres
71.93
Parcel #
188-140-11, 188-150-81, and 188-120-32
State Highways
1
Waterways
Pine Gulch Creek Watershed
Other Location Info
City/Nearest Community: Bolinas

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print