McCarrell/Barkentine Canyon Storm Drain Project

2 Documents in Project

Summary

SCH Number
2007101109
Lead Agency
City of Rancho Palos Verdes
Document Title
McCarrell/Barkentine Canyon Storm Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2008
Present Land Use
A significant portion of the project is located adjacent to residential uses, both medium and low density.
Document Description
The California Department of Fish and Game is issuing an Agreement Regarding Proposed Stream or Lake Alteration (SAA #1600-2008-0116-R5) to the project proponent, (City of Rancho Palos Verdes). The applicant proposes to alter the streambed and banks through the construction of a new inlet structure at eh base of the McCarrell Canyon to replace the existing inlet structure to improve the storm drain system. The applicant proposes to design a storm water drainage system to pipe storm water collected from both the McCarrell and Barkentine Canyons above Palos Verdes Drive South (PVDS). The storm drain system is proposed within a portion of Sea Gate Drive in the City of Rancho Palos Verdes, Los Angeles County, California.

Contact Information

Name
Naeem Siddiqui
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Palos Verdes Drive South
Zip
90275
Total Acres
1.0
Parcel #
Various
Waterways
Pacific Ocean to the south
Other Location Info
City/Nearest Community: San Pedro

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print