Slack Area Wastewater Collection System

2 Documents in Project

Summary

SCH Number
2007091097
Lead Agency
Yucaipa Valley Water District
Document Title
Slack Area Wastewater Collection System
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2007
Present Land Use
Residential: Golf Course/Residential Low (RL)/Single Family (S); Apartments/Condos (M); Golf Course (G)
Document Description
The proposed project would install approx. 9,000 linear ft. (LF) of 8-inch vitrified clay pipe (VCP) sewer mains and approx. 38 manholes, of which approx. 1,300 LF and six manholes (disturbing approx. 1.5 acres) would be constructed in unpaved easements at the southern end of the project area. A concrete-lined channel at the southern terminus of 3rd St. may be disturbed. The majority of the project would be constructed in paved streets. The sewer would be constructed with a minimum depth of cover of seven feet unless special construction is required. Manhole spacing would be 350 feet or less and manholes would be required at the end of each line, at a change in grade or sewer main size, at a change in alignment, or at any intersection of two or more sewer mains.

Contact Information

Name
Jack Nelson
Agency Name
Yucaipa Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
Calimesa
Counties
Riverside
Cross Streets
Myrtlewood Drive/3rd Street
Zip
92320
State Highways
10
Waterways
Wildwood Creek
Township
2S
Range
2W
Section
13
Base
SB

Notice of Determination

Approving Agency
Yucaipa Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.