M&T Chico Ranch/Llano Seco Rancho Pumping Plant Maintenance of Channel Alignment Sacramento River Mile 192.5

5 Documents in Project

Summary

SCH Number
2007082036
Lead Agency
United States Fish and Wildlife (FWS)
Document Title
M&T Chico Ranch/Llano Seco Rancho Pumping Plant Maintenance of Channel Alignment Sacramento River Mile 192.5
Document Type
NOD - Notice of Determination
Received
Posted
10/17/2007
Document Description
The proposed action would be to place 1,520 feet of rock and tree revetment on the west side of the Sacramento River and remove gravel on the east side of the river. The primary objective of placing longitudinal stone toe with tree revetment is to stabilize the site, thereby protecting the M&T Chico Ranch/Llano Seco Rancho pumping facility and the outfall for the City of Chico's Wastewater Treatment Plant. Approximately 9,120 tons of rock would be placed to about half of the bank height to an elevation of about 120 feet above mean sea level and the base of the revetment would be about 30 feet in width. Backfilling behind the stone toe will thicken the tow and provide a medium for revegetation. The top of the bench would be an average of approximately 10 feet. Woody brush material would be incorporated into the revetment by anchoring the material with cables and partially sunken large boulders to prevent loss during overtopping flows. The brush portion of the revetment would consist of multiple, alternative clusters of trees spaced approximately 10 to 15 feet apart at two elevations to provide instream and object cover at a range of flows.

Contact Information

Name
Tracy McReynolds
Agency Name
Dept. of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Chico
Counties
Butte, Glenn
Waterways
Sacramento River
Township
21N
Range
1W
Section
2
Base
MDB&M

Notice of Determination

Approving Agency
Dept. of Fish and Game
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.