Cosumnes River College Science Lab Expansion (Building 2)
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007082026
- Lead Agency
- Los Rios Community College District
- Document Title
- Cosumnes River College Science Lab Expansion (Building 2)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/12/2007
- Present Land Use
- Land Use: Educational General Plan/Zoning: School
- Document Description
- The proposed project includes the expansion of the Cosumnes River College Science Building (Building 2). The expansion will provide for instructional space, including new laboratories, as well as additional internal square footage for a variety of uses to be determined later. The project will include an expansion of the building by an estimated 15,023 square feet. Construction of the improvements is scheduled to occur in 2008 and 2009. The expansion project will result in an increased overall classroom space, and will likely result in a limited increase in demand for utilities, infrastructure, and parking at the campus or the site. All infrastructure upgrades and expanded utilities are included within the proposed building improvements.
- Contact Information
-
Daniel Hamilton
Los Rios Community College District
Lead/Public Agency
3753 Bradview Drive
Sacramento, CA 95827
Phone : (916) 361-8384
Location
- Cities
- Sacramento
- Counties
- Sacramento
- Cross Streets
- Center Parkway and Cosumnes River College Boulevard
- Zip
- 95823
- Total Acres
- < 1
- Parcel #
- 117-0140-041
- State Highways
- 99
- Railways
- SPRR
- Airports
- Sacramento International
- Schools
- Cosumnes River College
- Waterways
- Cosumnes River
- Township
- 7N
- Range
- 5E
- Section
- 15, 22
- Base
- MDB&M
Notice of Determination
- Approving Agency
- Cosumnes River College
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Los Rios Community College District
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.