Long Range Developemnt Plan Amendment 34 - Addendum #3 for Solar PV Systems

8 Documents in Project

Summary

SCH Number
2007051128
Lead Agency
University of California, Santa Barbara
Document Title
Long Range Developemnt Plan Amendment 34 - Addendum #3 for Solar PV Systems
Document Type
NOD - Notice of Determination
Received
Posted
4/28/2016
Present Land Use
Public Facilities
Document Description
In response to CA Coastal Commission comments on the Notice of Impending Development for solar photovoltaic energy systems at six campus sites, the Project makes four minor modifications to the UC Santa Barbara Long Range Development Plan (LRDP) and EIR to make two of the six sites consistent with the LRDP and LRDP EIR, as follows: 1. Modifies LRDP EIR Mitigation Measure BIO-3D and language contained within LRDP Policy LU-29 and Appendix 2 to clarify perceived inconsistencies regarding tree removal and replacement requirements for native oak trees. 2. Revises Policy LU-24 to reinforce the exemption of canopy solar systems from building height limits, and add a maximum height limit of such systems of 60 feet.

Contact Information

Name
Shari Hammond
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Goleta, Santa Barbara
Counties
Santa Barbara
Cross Streets
State Highway 217 and Los Carneros Avenue
Zip
93106
Total Acres
1,055
State Highways
101
Airports
Santa Barbara Municipal
Schools
Isla Vista Elementary
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.