06-KER-14 KP 73.9/100.2 (PM 45.9/62.3) Freeman Gulch Four-Lane Project
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2006121082
- Lead Agency
- Caltrans 6 (Fresno) (California Department of Transportation, District 6)
- Document Title
- 06-KER-14 KP 73.9/100.2 (PM 45.9/62.3) Freeman Gulch Four-Lane Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/5/2007
- Present Land Use
- Mainly open space desert (Bureau of Land Management). Z: Estate, Limited Agriculture, Medium Industrial.
- Document Description
- Caltrans proposes to convert the existing two-lane conventional highway into a four-lane, divided, controlled-access expressway. Proposed improvements on the existing roadway include placing an asphalt concrete overlay, flattening cut slopes, widening fill slopes, widening paved shoulders, and installing a median and inside/outside paved shoulders. The project also would require constructing a new Freeman Gulch Bridge, widening or replacing the existing Freeman Gulch Bridge and upgrading intersections.
- Contact Information
-
Sarah Gassner
Department of Transportation, District 6
2015 E. Shields Avenue, Suite 100
Fresno, CA 93726-5428
Phone : (559) 243-8243
Location
- Cities
- Ridgecrest
- Counties
- Kern
- Cross Streets
- SR-14 / Redrock Inyokern Road
- Zip
- 93527
- State Highways
- 14
- Waterways
- Little Dixie Wash, Sage Canyon Wash, Freeman Gulch Wash, and two unnamed
- Other Location Info
- City/Nearest Community: Inyokern
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Caltrans, District 6, 2015 E. Shields Ave., Suite 100, Fresno, CA 93726
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.