Advanced Light Source User Support Building (USB)

2 Documents in Project

Summary

SCH Number
2006112039
Lead Agency
University of California, Berkeley
Document Title
Advanced Light Source User Support Building (USB)
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2007
Present Land Use
Office-Laboratory / Institutional / Light Source Research & Engineering Area
Document Description
The project will construct a three-story, approximately 30,000 gross square-foot (gsf)/17,416 net square foot (nsf) User Support Building (USB). The USB would be approximately 48 feet in height and is limited to three standard-height laboratory/office floor levels. The site is currently occupied by existing Building 10, a two-story approximately 16,038 gsf structure constructed in 1944, which would be demolished as a part of the project. The USB would be used for the precision component assembly of experimental equipment, two-story beamline equipment staging, a potential figure beamline extension from the ALS building, chemical and biological prep laboratories, chemical storage, and office space. Office/Office Support space would account for 10,005 nsf and Lab/Lab Support would account for 7,411 nsf. The remaining 13,000 nsf of the USB would consist of lesser used areas in the building including, but not limited to, elevator shafts, ductwork shafts, and stairwells. At peak capacity, the project would accommodate approximately 85 occupants, however, because they would be relocated from other buildings on the LBNL site the project would not result in a substantial net population increase at LBNL.

Contact Information

Name
John E. Zimmermann
Agency Name
University of California Planning Design & Construction
Contact Types
Lead/Public Agency

Location

Cities
Berkeley
Counties
Alameda
Cross Streets
Hearst / Gayley
Zip
94720
Parcel #
057-2042-4-8
Schools
UCB, Berkeley HS
Township
1S
Range
4W
Section
6
Base
MD

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.