United Technologies Corporation-Pratt & Whitney Site Closure Program (California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2010-0016-03 (ITP
8 Documents in Project
Summary
SCH Number
2006102114
Lead Agency
Santa Clara County
Document Title
United Technologies Corporation-Pratt & Whitney Site Closure Program (California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2010-0016-03 (ITP
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2015
Present Land Use
Zoning: A1 (General Use) and HS (Hillsides). General Plan: Industrial and Ranchlands
Document Description
The Project involves five phases of site closure operations at the 5,200-acre UTC San Jose Facility. The property was historically used to design, manufacture, and test solid fuel rocket motors from 1959 until 2004. Closure operations include the removal of site infrastructure, including buildings, perchlorate remediation in soil and groundwater and installation and operation of a groundwater purification system. The Project as authorized in the ITP will result in temporary impacts to 12.7 acres of California tiger salamander (CTS) (Ambystoma californiense) upland refugia habitat. The Project is expected to result in incidental take of CTS which is designated threatened under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of (Amendment) increases the temporary upland habitat impacts by 12 acres resulting in impacts to 24.7 acres of CTS refugia habitat. The Amendment requires corresponding increases to the required Habitat Management (HM) lands by 12 acres, for a total of 27 acres of upland refugia HM lands.
Contact Information
Name
Dave Johnston
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Jose
Counties
Santa Clara
Cross Streets
Metcalf Road and San Felipe Road
Total Acres
5,200 site
Parcel #
Multiple
State Highways
101
Waterways
Four creeks, which flow to Anderson Reservoir
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.