Drilling and Equipping Wells 30 and 31

2 Documents in Project

Summary

SCH Number
2006091161
Lead Agency
City of Colton
Document Title
Drilling and Equipping Wells 30 and 31
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2007
Present Land Use
The project site comprises two disturbed, graded, City-owned parcels located in a developed, commercial area. Z/GP: Planned Community (PC)
Document Description
The project consists of constructing, equipping, and operating two domestic water production wells in the City of Colton on two adjacent City-owned parcels. The project is anticipated to include the following activities: site clearing and fencing; drilling the wells, casing the wells, developing the wells using air-lift equipment, and testing of the wells using a temporary diesel-driven pump; disposing of development and testing water; installing pumping units, motors, electrical switchgear, and electrical power service, installing valves, site piping, and appurtenances; installing disinfection facilities; installing discharge piping from pump discharges to Ashley Way (northerly of the project site); painting of aboveground facilities; constructing enclosures for protection of aboveground facilities; disinfecting the wells; start-up of the well pumping plants; and operating the wells and well pumping plants. Development, testing, and operational water discharges will be discharged to an onsite storm drain inlet leading to the Reche Canyon Channel, located adjacent to and southerly of the project site.

Contact Information

Name
Eric Fraser
Agency Name
City of Colton
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
E. Cooley Drive and Ashley Way
Zip
92324
Parcel #
0276-144-48-0000, 49-0000
State Highways
I-215
Railways
UPRR
Schools
Multiple
Waterways
Santa Ana River
Township
1S
Range
4W
Section
28
Base
SBM

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print