Bajamont Groundwater Extraction and Treatment "L1" System Project

2 Documents in Project

Summary

SCH Number
2006072111
Lead Agency
Carmichael Water District
Document Title
Bajamont Groundwater Extraction and Treatment "L1" System Project
Document Type
NOD - Notice of Determination
Received
Posted
9/22/2006
Document Description
The Proposed Project is a component of the existing groundwater containment and treatment program undertaken through a cooperative agreement between Aeroject and Carmichael Water District (CWD). Initiated in response to detection of NDMA groundwater contamination within the CWD, the proposed project is designed to arrest the down gradient spread of the contaminant plume, thereby protecting the downgradient quality of the aquifer, remediating the contaminated portions of the acquifer, and preventing additional impacts to public drinking water supply wells, including existing CWD wells. The proposed project is comprised of four primary components: a groundwater treatment plant, at least one groundwater extraction well, modifications to an existing reinforced concrete outfall, and underground pipelines.

Contact Information

Name
Steve Nugent
Agency Name
Carmichael Water District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Grant Avenue/Hollister Avenue
Zip
95608
Total Acres
0.25
Parcel #
260-0230-055
Schools
Carmichael Elem School
Waterways
Unnamed tributary to the American River/American River
Township
9N
Range
6E
Base
Mt. Diab
Other Location Info
Community: Carmichael

Notice of Determination

Approving Agency
Carmichael Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print