Bay Division Pipeline Reliability Upgrade Project
10 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2006062002
- Lead Agency
- City and County of San Francisco
- Document Title
- Bay Division Pipeline Reliability Upgrade Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/4/2010
- Document Description
- A 7 mi. steel pipeline extending from MissionBlvd. in Fremont to the Newark Valve Lot, located within the existing SFPUC ROW of BDLP Nos. 1 & 2; A 5 mi. tunnel from the Newark Valve Lot to the Ravenswood Valve Lot, crossing under the Bay and the adjacent marshlands; BDPL Nos. 1 & 2 would tie into the tunnel at both ends and would be decommissioned between the Newark and Ravenswood Valve Lots; A 9 mi. steel pipeline extending from Ravenswood Valve Lot to Pulgas Tunnel Portal, located within existing ROW of BDPL Nos. 1 & 2.
- Contact Information
-
Paul D. Thayer
California State Lands Commission
Lead/Public Agency
100 Howe Avenue, Suite 100 south
Sacramento, CA 95828-8202
Phone : (916) 574-1800
Location
- Cities
- East Palo Alto Fremont Menlo Park Newark Redwood City San Carlos
- Counties
- Alameda San Mateo
- Cross Streets
- Various
- Airports
- Palo Alto Airport
- Other Location Info
- North Fair Oaks and Palomar Park
- Other Information
- HWY: I-880, SR-238, SR-109, SR-114, US 101, SR-82, SR-84, I-680, I-280 Waterways: San Francisco Bay, Newark Slough, Mission Creek, Muskrat Creek, Irvington Creek, realigned surface to tributary Mowry Slough, two realigned surface tributaries to Plummer Creek, three excavated urban flood control channels, two urbanized flood control channels, one perennial stream, eight unnamed ephemeral tributaries and one unnamed intermittent tributary to Cordilleras Creek. Several unnamed creeks and flood control channels that flow to Newark Slough, and Mowry Slough, Mid Slough, Coyote Creek, and Plummer Creek Railways: Union Pacific, Southern Pacific, Caltrain, Altamont Commuter Express Schools: James L. Bunker ES, Joseph Azevada ES, G.M. Walters MS, St. Leonard-Santa Paula ES, William Hopkins MS, Joshua Chadbourne ES, Mission San Jose HS, Saint Matthia ES, West Bay Christian Academy, John Fill ES, Hawes ES, James Flood ES, Belle Haven ES, Mid-Peninsula HS, Costano ES, Green Oaks Academy, J. Haley Durham ES, Beechwood School, Conrad Noll School, Newark Community Church, Sequoia and Redwood HS
Notice of Determination
- Approving Agency
- California State Lands Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- California State Lands Commission 100 Howe Ave, Suite 100 South Sacramento, CA 95825-8202
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.