Bay Division Pipeline Reliability Upgrade Project
10 Documents in Project
Summary
SCH Number
2006062002
Lead Agency
City and County of San Francisco
Document Title
Bay Division Pipeline Reliability Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2009
Document Description
The proposed project involves construction of a new 21-mile Bay Division Pipeline (BDPL) No. 5 in the existing San Francisco Public Utility Commission Right of Way for BDPL Nos. 1 and 2. The project extends from approximately 100' east of Mission Blvd. in Fremont to the Plugas Tunnel Portal. In the East Bay, the proposed project includes a 7-mile segment starting at the Irvington portal and ending at the Newark Valve Lot. There is a 5-mile portion of the proposed project that passes under San Francisco Bay and the adjacent marshlands. This segment is referred to as the Bay Tunnel. The new Bay Tunnel also would replace BDPL Nos. 1 and 2 between the Newark and Ravenswood valve lots. Finally, there is a 9-mile segment of pipelines from the Ravenswood Shaft Site to the Pulgas Tunnel.
Contact Information
Name
Wes Stokes
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
East Palo Alto, Fremont, Menlo Park, Newark, Redwood City, San Carlos
Counties
Alameda, San Mateo
Cross Streets
Various
Airports
Palo Alto Airport
Other Location Info
North Fair Oaks and Palomar Park
Other Information
HWY: I-880, SR-238, SR-109, SR-114, US 101, SR-82, SR-84, I-680, I-280
Waterways: San Francisco Bay, Newark Slough, Mission Creek, Muskrat Creek, Irvington Creek, realigned surface to tributary Mowry Slough, two realigned surface tributaries to Plummer Creek, three excavated urban flood control channels, two urbanized flood control channels, one perennial stream, eight unnamed ephemeral tributaries and one unnamed intermittent tributary to Cordilleras Creek. Several unnamed creeks and flood control channels that flow to Newark Slough, and Mowry Slough, Mid Slough, Coyote Creek, and Plummer Creek
Railways: Union Pacific, Southern Pacific, Caltrain, Altamont Commuter Express
Schools: James L. Bunker ES, Joseph Azevada ES, G.M. Walters MS, St. Leonard-Santa Paula ES, William Hopkins MS, Joshua Chadbourne ES, Mission San Jose HS, Saint Matthia ES, West Bay Christian Academy, John Fill ES, Hawes ES, James Flood ES, Belle Haven ES, Mid-Peninsula HS, Costano ES, Green Oaks Academy, J. Haley Durham ES, Beechwood School, Conrad Noll School, Newark Community Church, Sequoia and Redwood HS
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.