Bay Division Pipeline Reliability Upgrade Project
10 Documents in Project
Summary
SCH Number
2006062002
Lead Agency
City and County of San Francisco
Document Title
Bay Division Pipeline Reliability Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2009
Document Description
A welded-steel pieline, ~72 inches in diameter, extending along the 7 mile reach from Mission Boulevard in Fremont to the Newark Valve Lot, located within the existing SFPUC ROW of BDPL Nos. 1 and 2; The Bay Tunnel segment of BDPL No. 5, approximately 108 inches in diameter, extending 5 miles from the Newark Valve Lot to the Ravenswood Valve Lot, crossing under the Bay and the adjacent marshlands. BDPL Nos. 1 and 2 would tie into the tunnel at both ends and would be decommissioned between Newark and Ravenswood Valve Lots; A welded-steel pipeline, ~60 inches in diameter, extending along the 9 mile reach from Ravenswood Valve Lot to Pulgas Tunnel Portal, located within the existing SFPUC ROW of BDPL Nos. 1 and 2; New facilities at 6 existing valve lot locations, including new concrete valve vaults and control buildings that house electrical control panels, isolation valves, mechanical equipment, and cross-connections between BDLP No. 5 and the existing BDLP Nos. 1 and 2; A new flow-metering vault at Hassler Road in Redwood City; and A new fiber optic cable installed on existing towers between PG&E's Ravenswood Substation in Menlo Park and its Ames Substation in Mountain View.
Contact Information
Name
Timothy Johnston
Agency Name
City and County of San Francisco
Contact Types
Lead/Public Agency
Phone
Location
Cities
East Palo Alto, Fremont, Menlo Park, Newark, Redwood City, San Carlos
Counties
Alameda, San Mateo
Cross Streets
Various
Airports
Palo Alto Airport
Other Location Info
North Fair Oaks and Palomar Park
Other Information
HWY: I-880, SR-238, SR-109, SR-114, US 101, SR-82, SR-84, I-680, I-280
Waterways: San Francisco Bay, Newark Slough, Mission Creek, Muskrat Creek, Irvington Creek, realigned surface to tributary Mowry Slough, two realigned surface tributaries to Plummer Creek, three excavated urban flood control channels, two urbanized flood control channels, one perennial stream, eight unnamed ephemeral tributaries and one unnamed intermittent tributary to Cordilleras Creek. Several unnamed creeks and flood control channels that flow to Newark Slough, and Mowry Slough, Mid Slough, Coyote Creek, and Plummer Creek
Railways: Union Pacific, Southern Pacific, Caltrain, Altamont Commuter Express
Schools: James L. Bunker ES, Joseph Azevada ES, G.M. Walters MS, St. Leonard-Santa Paula ES, William Hopkins MS, Joshua Chadbourne ES, Mission San Jose HS, Saint Matthia ES, West Bay Christian Academy, John Fill ES, Hawes ES, James Flood ES, Belle Haven ES, Mid-Peninsula HS, Costano ES, Green Oaks Academy, J. Haley Durham ES, Beechwood School, Conrad Noll School, Newark Community Church, Sequoia and Redwood HS
Notice of Determination
Approving Agency
San Francisco City and County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes