Bay Division Pipeline Reliability Upgrade Project

10 Documents in Project

Summary

SCH Number
2006062002
Lead Agency
City and County of San Francisco
Document Title
Bay Division Pipeline Reliability Upgrade Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
The proposed Bay Division Pipeline Reliability Upgrade Project includes construction of an additional 21-mile pipeline segment from Irvington Portal in Fremont, California, to Pulgas Portal in Redwood City, which would include a five-mile tunnel under San Francisco Bay ("Bay Tunnel") and adjacent marshlands. The new Bay Tunnel would replace BDPLs Nos. 1 and 2 between the Newark and Ravenswood Valve Lots. The Project would also improve the seismic and water-delivery reliability of the BDPLs by allowing existing BDPL facilities to be taken out of service for maintenance while continuing to meet the water supply needs of SFPUC customers through 2030.

Contact Information

Name
Timothy Johnston
Agency Name
City and County of San Francisco
Contact Types
Lead/Public Agency

Location

Cities
East Palo Alto, Fremont, Fremont, Newark, East Palo Alto, Redwood City, Menlo Park, ..., Menlo Park, Newark, Redwood City
Counties
Alameda, San Mateo
Cross Streets
Various
Airports
Palo Alto Airport
Other Location Info
North Fair Oaks and Palomar Park
Other Information
HWY: I-880, SR-238, SR-109, SR-114, US 101, SR-82, SR-84, I-680, I-280 Waterways: San Francisco Bay, Newark Slough, Mission Creek, Muskrat Creek, Irvington Creek, realigned surface to tributary Mowry Slough, two realigned surface tributaries to Plummer Creek, three excavated urban flood control channels, two urbanized flood control channels, one perennial stream, eight unnamed ephemeral tributaries and one unnamed intermittent tributary to Cordilleras Creek. Several unnamed creeks and flood control channels that flow to Newark Slough, and Mowry Slough, Mid Slough, Coyote Creek, and Plummer Creek Railways: Union Pacific, Southern Pacific, Caltrain, Altamont Commuter Express Schools: James L. Bunker ES, Joseph Azevada ES, G.M. Walters MS, St. Leonard-Santa Paula ES, William Hopkins MS, Joshua Chadbourne ES, Mission San Jose HS, Saint Matthia ES, West Bay Christian Academy, John Fill ES, Hawes ES, James Flood ES, Belle Haven ES, Mid-Peninsula HS, Costano ES, Green Oaks Academy, J. Haley Durham ES, Beechwood School, Conrad Noll School, Newark Community Church, Sequoia and Redwood HS

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, State Water Resources Control Board, Division of Loans and Grants, California Department of Transportation, District 4 (DOT), San Francisco Bay Conservation and Development Commission (BCDC)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT), San Francisco Bay Conservation and Development Commission (BCDC)

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print