Rocky Point Erosion Control Project, Phases 3 & 4

2 Documents in Project

Summary

SCH Number
2006042089
Lead Agency
City of South Lake Tahoe
Document Title
Rocky Point Erosion Control Project, Phases 3 & 4
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2006
Present Land Use
Plan Area Statement 92 & 85, Land Use Classification = Residential, Stateline/Ski Run Community Plan, Land Use Classification = Commercial/Tourist Accomodation
Document Description
Construct erosion control improvements within a 78-acre area bordered on the west by Aspenwalk Road, on the north by Primrose Road and Midway Avenue, on the east by Rocky Point Road, and on the south by Keller Road. Erosion control improvements include soil and vegetation restoration, stormwater treatment basins, infiltration chambers, boulder parking barriers, rolled curb and gutter, stormdrain pipe, drop inlets, manholes, sediment traps, AC swales, AC berms, and cobble swales. The planned improvements will be constructed in the City right of way, on public land, and privately owned parcels that will be acquired by the City or where easements will be purchased. Approximately 132 trees (60 smaller than 10 inches diameter at breast height (dbh) and 72 trees 10 inches dbh or greater) will be removed. No trees larger than 24 inches dbh will be removed.

Contact Information

Name
Stan Hill
Agency Name
City of South Lake Tahoe
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Pioneer Trail and Sheperds Road
Zip
96150
Parcel #
many
State Highways
Hwy. 50 & 89
Waterways
Lake Tahoe

Notice of Determination

Approving Agency
City of South Lake Tahoe
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print