Railyards Specific Plan Update, Medical Center, Stadium, and Stormwater Outfall Subsequent EIR

21 Documents in Project

Summary

SCH Number
2006032058
Lead Agency
City of Sacramento
Document Title
Railyards Specific Plan Update, Medical Center, Stadium, and Stormwater Outfall Subsequent EIR
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2019
Present Land Use
Vacant / Railyards Specific Planning District / Urban Center High and Urban Neighborhood High Density, Parks and Recreation
Document Description
Approval of Permit No. 19134, under CA code of regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a regulated stream (Table 8.1; Title 23, Div. 1, Article 8): To install a stormwater discharged system including: a concrete outfall structure with flap gate; riprap on the lower waterside slope; four(4) 42-inch diameter and one(1) 12-inch diameter cement mortar-lined and coated steel pipes; steps on the waterside levee slope; valve box on the levee crown; retaining walls on the landside levee slope and berm; and a pump station with a wet well approx. 50-feet landward of the landside levee under the existing elevated I-5 freeway.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
East of the Sacramento River and I-5, south of North B Street
Zip
95814
Total Acres
244
Parcel #
002-0010-023, -044, -049, -052, -054, -056, -060, -062, -063
State Highways
I-5, SR 160, I-80, US 50, Bus 80
Railways
UPRR, Amtrak
Schools
Washinton ES, William Land ES, Elkhorn Village ES (West Sac)
Waterways
Sacramento River, American River
Township
7N
Range
4E
Section
36
Other Location Info
Richards Boulevard Area

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print