Sacramento Railyards Specific Plan Update: Stormwater Outfall (Lake or Streambed Alteration Agreement No. 1600-2016-0245-R2)

21 Documents in Project

Summary

SCH Number
2006032058
Lead Agency
City of Sacramento
Document Title
Sacramento Railyards Specific Plan Update: Stormwater Outfall (Lake or Streambed Alteration Agreement No. 1600-2016-0245-R2)
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2017
Present Land Use
Vacant / Railyards Specific Planning District / Urban Center High and Urban Neighborhood High Density, Parks and Recreation
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0245-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Sacramento. Project is limited to development, construction, and operation of a wet well and stormwater outflow to allow the movement of rainfall, as stormwater, into the Sacramento River. The project will move treated rainwater that falls on hard surfaces and is treated at the source through low impact development (LID) techniques, (e.g. impervious bioswales) from Sacramento Railyards Specific Plan (RSP) Area. These LID techniques allow for water to be arrested and for particles to settle out resulting in lower turbidity stormwater that is then collected in the proposed project's wet well. Then, water is pumped from the wet well down the stormwater outflow pipes and through flap gates into the Sacramento River.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
East of the Sacramento River and I-5, south of North B Street
Zip
95814
Total Acres
244
Parcel #
002-0010-023, -044, -049, -052, -054, -056, -060, -062, -063
State Highways
I-5, SR 160, I-80, US 50, Bus 80
Railways
UPRR, Amtrak
Schools
Washinton ES, William Land ES, Elkhorn Village ES (West Sac)
Waterways
Sacramento River, American River
Township
7N
Range
4E
Section
36
Other Location Info
Richards Boulevard Area

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print