South Lakeport Annexation Project
6 Documents in Project
Summary
SCH Number
2005102104
Lead Agency
City of Lakeport
Document Title
South Lakeport Annexation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/19/2019
Document Description
The proposed South Lakeport Annexation Project consists of the annexation of 136. 78 acres located along the South Main Street and Soda Bay Road corridor just south of the current city limits of the City of Lakeport. The land lies with the approved Sphere of Influence (SOI) for the City of Lakeport and is prezoned to be consistent with its planned and probable use (Major Retail and Industrial). The City plans to
extend water service to the annexation area which will allow for installation of fire hydrants. If annexed, the City would assume responsibility for operation and maintenance of wastewater collection system and continue to provide wastewater treatment services to the annexation area. The City prepared an Initial Study/Environmental Checklist for the South Lakeport Annexation Project which concluded that, per CEQA Guidelines Section 15153(b)(1) and Section 15162(a), the Environmental Impact Report that was prepared for the City of Lakeport General Plan 2025 (SCH# 2005102104) and the Addendum to the Lakeport General Plan EIR that was prepared for the 2015 General Plan amendment updating the Lakeport Sphere of Influence are sufficient to serve as the environmental documents for the South Lakeport Annexation Project.
Contact Information
Name
Kevin Ingram
Agency Name
City of Lakeport
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
City of Lakeport
Contact Types
Project Applicant
Location
Cities
Lakeport
Counties
Lake
Other Location Info
136.78 acres of land located south of the existing Lakeport city limits.
adjacent to South Main Street and Soda Bay Rd. east of State Route 29
Notice of Determination
Approving Agency
City of Lakeport
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.