Addendum to the Calaveras Dam Replacement Project EIR
15 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005102102
- Lead Agency
- City and County of San Francisco
- Document Title
- Addendum to the Calaveras Dam Replacement Project EIR
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/23/2013
- Present Land Use
- PLU: Agricultural lands and open space, with some low-density, large-lot rural residential areas
- Document Description
- Project modifications are necessary to address geotechnical hazards related to a previously unknown landslide feature in the left dam abutment for the new dam. These modifications would affect the excavation and disposal of material associated with construction of the left dam abutment and spillway and would increase the total volume of materials required to be excavated, handled and disposed of for the project by approximately 3 million cubic yards, would increase the project footprint by 29.1 acres, and would increase the duration of construction by 3 years.
- Contact Information
-
Brett Becker
SFPUC
Lead/Public Agency
525 Golden Gate Ave., 6th Floor
San Francisco, CA 94102
Phone : (415) 554-1650
Location
- Coordinates
- 37°29'"N 121°49'"W
- Cities
- Fremont Milpitas
- Counties
- Alameda Santa Clara
- Cross Streets
- Calaveras Creek in the Diablo Mountain Range
- Zip
- 94586
- Total Acres
- 1960 ac
- Parcel #
- 096-0100-027-00
- Waterways
- Calveras & Alameda Creeks
- Township
- 05S
- Range
- 01E
- Section
- 13
Notice of Determination
- Approving Agency
- San Francisco Public Utilities Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- SFPUC, 525 Golden Gate Ave., 6th Floor, San Francisco, CA 94102
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.