Addendum to the Calaveras Dam Replacement Project EIR
16 Documents in Project
Summary
SCH Number
2005102102
Lead Agency
City and County of San Francisco
Document Title
Addendum to the Calaveras Dam Replacement Project EIR
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2013
Present Land Use
PLU: Agricultural lands and open space, with some low-density, large-lot rural residential areas
Document Description
Project modifications are necessary to address geotechnical hazards related to a previously unknown landslide feature in the left dam abutment for the new dam. These modifications would affect the excavation and disposal of material associated with construction of the left dam abutment and spillway and would increase the total volume of materials required to be excavated, handled and disposed of for the project by approximately 3 million cubic yards, would increase the project footprint by 29.1 acres, and would increase the duration of construction by 3 years.
Contact Information
Name
Brett Becker
Agency Name
SFPUC
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fremont, Milpitas
Counties
Alameda, Santa Clara
Cross Streets
Calaveras Creek in the Diablo Mountain Range
Zip
94586
Total Acres
1960 ac
Parcel #
096-0100-027-00
Waterways
Calveras & Alameda Creeks
Township
05S
Range
01E
Section
13
Notice of Determination
Approving Agency
San Francisco Public Utilities Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.