LVMWD Proposed Mulholland Highway Potable Waterlines Improvements
2 Documents in Project
Summary
SCH Number
2005101069
Lead Agency
Las Virgenes Municipal Water District
Document Title
LVMWD Proposed Mulholland Highway Potable Waterlines Improvements
Document Type
NOD - Notice of Determination
Received
Posted
12/1/2005
Present Land Use
Potable Water Transmission Pipeline
Document Description
The proposed modifications are divided into two phases. Phase 1A includes new pipeline (10 and 12 inch diameter) within the Mulholland Highway right-of-way between Old Topanga Canyon Road and Dry Canyon-Cold Creek Road (5,800 feet). Phase 1B includes new pipeline (10-inch diameter) within the Mulholland Highway right-of-way from the Cold Canyon Pump Station near the Cold Canyon/Mulholland Highway intersection east to the Stunt Road/Mulholland Highway intersection (4040 feet). Phase 2 involves the installation of three segments of 10-inch diamter pipeline. The northern portion would extend from the Mountain Park Drive / Mulholland Highway intersection northeast to the Valley View Road / Mulholland Highway intersection (2,200 feet).
Contact Information
Name
Brett Dingman
Agency Name
Las Virgenes Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Calabasas
Counties
Los Angeles
Cross Streets
Mulholland Hwy. / Stunt Road
Zip
91302
Total Acres
~ 1
State Highways
101
Schools
Viewpoint School
Waterways
Cold Creek
Notice of Determination
Approving Agency
Las Virgenes Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.