Seal Beach Shopping Center Renovation (MND 05-5)
3 Documents in Project
Summary
SCH Number
2005101019
Lead Agency
City of Seal Beach
Document Title
Seal Beach Shopping Center Renovation (MND 05-5)
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2005
Present Land Use
C-2 / Commercial; C-2 / General Commercial
Document Description
The proposed project consists of the renovation and reconstruction of the Seal Beach Shopping Center. A portion of the center will be demolished including the grocery/drug store, drive through coffee shop, car wash, gasoline/service station and gas pump island canopy. The grocery store will be reconstructed in its existing location. The drug store will be relocated to a new building on the west end of the northern retail building. The service station will be relocated without the associated repair shop, and the coffee shop will be reconstructed adjacent to the gas station.
Contact Information
Name
Lee Whittenberg
Agency Name
City of Seal Beach
Contact Types
Lead/Public Agency
Phone
Location
Cities
Seal Beach
Counties
Orange
Cross Streets
Pacific Coast Highway and Bolsa Ave.
Zip
90740
Total Acres
7.9
Parcel #
043-260-2, 043-260-3
State Highways
I-405, and 122
Railways
US Navy Railroad
Schools
McGaugh Elementary School
Waterways
San Gabriel River, Pacific Ocean
Notice of Determination
Approving Agency
City of Seal Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.