The subject of this project is the construction of new roadway, the widening and rehabilitation of existing roadway, the installation of drainage improvements, and the installation of pedestrian walkways along Soda Bay Road and Mission Rancheria Road. The existing culvert at Rumsey Slough will be removed and replaced with a longer pipe that will extend beneath the new and old portions of Soda Bay Road; a distance of about 160 ft. About 320 ft of existing roadside ditch running easterly from Rumsey Slough on the southerly edge of Soda Bay Road will be filled and replaced with a piped culvert system.
Contact Information
Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lakeport
Counties
Lake
Cross Streets
Soda Bay Road, Mission Rancheria Road
Zip
95453
Total Acres
8
Parcel #
Various
State Highways
29
Schools
Tribal Pre-School
Waterways
Thompson Creek, Rumsey Slough
Township
14/13N
Range
9W
Section
6,31
Base
MDB&M
Other Information
Section: 32
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes