Franklin Boulevard Widening Project

2 Documents in Project

Summary

SCH Number
2005072019
Lead Agency
City of Elk Grove
Document Title
Franklin Boulevard Widening Project
Document Type
EIR - Draft EIR
Received
Present Land Use
National Wildlife Preserve adjacent to the south of Elk Grove Boulevard and west of Franklin Boulevard, and residential development, commercial development, and undeveloped land to the north and east.
Document Description
The project will widen Franklin Boulevard from five lanes to six lanes and a portion of Franklin Boulevard from three lanes to six lanes. Elk Grove Boulevard would be widened approximately 24 feet on the south side (eastbound) between the UPRR overcrossing and Franklin Boulevard, a distance of approximately 0.25 mile. Franklin Boulevard would be widened approximately 26 feet on the west from its intersection with Elk Grove Boulevard south to approximately 80 feet south of Poppy Ridge Road, a distance of approximately 1.1 mile, to provide for a six lane arterial with median landscaping. The proposed improvements to Elk Grove Boulevard would being at the UPRR overhead structure and end at the intersection of Franklin Boulevard and Elk Grove Boulevard. Some minor road re-striping would occur on the UPRR overhead structure and on the eastbound lanes of Elk Grove Bouevard west of the overhead structure to its intersection with Four Winds Drive. The proposed improvements to Franklin Boulevard would begin at and include the intersection of Franklin Boulevard and Elk Grove Boulevard, and extend to the south approximately 80 feet south of the Franklin Boulevard and Poppy Ridge Road intersection. The existing lanes on Franklin Boulevard would become the utlimate three northbound lanes, median, and one southbound lane, while two new southbound lanes and two bus turnouts added to the west side of the existing road. Seven existing oak trees on the west side of Franklin Bouevard would need to be removed, and an intermittent open earthen storm water drainage ditch running adjacent to most of the west side of existing Franklin Boulevard would be filled to accommodate the new southbound lanes and bus turnouts.

Contact Information

Name
Crystal Spur
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Franklin Blvd (Poppy Ridge Rd to Elk Grove Blvd) & a portion of Elk Grove Blvd, west of Franklin
Zip
95758
State Highways
I-5
Railways
UPRR
Schools
9
Waterways
Drainage channels
Township
6N,7N
Range
5E
Section
5, 32
Base
MDBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Emergency Services, California, Office of Historic Preservation, Resources Agency, California Department of Fish and Wildlife, North Central Region 2 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, North Central Region 2 (CDFW)
Development Types
Transportation:Local Road (Improvements)
Local Actions
Roadway Improvement
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.