Docks Area Specific Plan
5 Documents in Project
Summary
SCH Number
2005062143
Lead Agency
City of Sacramento
Document Title
Docks Area Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2011
Document Description
The project consists of the DTSC approval of a Remedial Action Plan for the PG&E (the Site). This action is being taken pursuant to authority granted under the CA Health & Safety Code, Chapter 6.8 and the federal Comprehensive Environmental Response, Compensation, and Liability Act, Section 121.
The Docks Area Specific Plan EIR certified in 2009 by the City of Sacramento (SCH#2005062143) conceptually addressed the proposed Site Cleanup. As a Responsible Agency under CEQA, DTSC provided comments on the EIR in order to provide the City with information concerning the extent of soil and groundwater contamination existing at the Site, DTSC's regulatory authority over approval of future remediation activities, and conceptual remediation strategies because some RAP details had not been fully determined at the time EIR was certified. DTSC's review of the final EIR concluded that the impacts contemplated in the EIR were consistent with the impacts anticipated for activities contained in the RAP. Further DTSC concluded that an Addendum to the EIR was the appropriate CEQA document to prepare to update the specified project activities and impacts that will result from implementing the RAP.
Contact Information
Name
Sam Martinez
Agency Name
Department of Toxic Substances Control (DTSC)
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Cross Streets
Front Street, Pioneer Bridge, Sacramento River
Zip
95814
Total Acres
29.27
Parcel #
multiple
State Highways
I-5, I-80, SR 99, SR 50
Railways
Walnut Grove Branch Line
Airports
Sacramento International
Schools
Wm Land Elementary, Sutter Middle School
Waterways
Sacramento and American Rivers
Township
8N
Range
4E
Section
2
Base
MDB&M
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.