Livorno at Positano

20 Documents in Project

Summary

SCH Number
2005062010
Lead Agency
City of Dublin
Document Title
Livorno at Positano
Document Type
NOD - Notice of Determination
Received
Posted
9/20/2010
Document Description
NOTE: Reference SCH #s 2001052114 & 1991103064 The proposed project is part of the larger project known as Fallon Village. In 2002, a number of owners in Eastern Dublin filed applications for annexation of portions of the current project site to the City and to the Dublin San Ramon Services District (DSRSD). At that time, the City prepared and certified a SEIR (SCH #2001052114, Resolution 40-02) for that project. The SEIR was a supplement to the 1993 Eastern Dublin EIR certified by the City Council on May 10, 1993 (SCH #1991103064, Resolution 51-930). The Fallon Village project proposed in 2005 (for PA 04-040) included a specific proposal for the Braddock and Logan properties (PA 05-038), now referenced as Positano. Based on the results of an Initial Study, the City prepared a Draft SEIR to the 1993 and 2002 EIRs which was circulated for public review from August 23, 2005 through October 6, 2005 (SCH #2005062010). A Final SEIR dated October 2005 containing written responses to all comments received on the Draft SEIR and was reviewed and certified by the City Council on December 6, 2005 by Resolution No. 222-05. Significant unavoidable impacts were identified in these EIRs that required the City Council to adopt Statements of Overriding Considerations with the approval of each EIR.

Contact Information

Name
Jeri Ram
Agency Name
City of Dublin
Contact Types
Lead/Public Agency

Location

Cities
Dublin
Counties
Alameda
Cross Streets
Fallon Road and Croak Road
Zip
94568
Total Acres
25.5
Parcel #
Varies
State Highways
I-580 and I-680
Railways
UPRR
Airports
Livermore
Waterways
Cottonwood Creek

Notice of Determination

Approving Agency
City of Dublin
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print