Littlerock Reservoir Grade Control Project (Lake or Streambed Alteration Agreement No. 1600-2018-0077-R5)

6 Documents in Project

Summary

SCH Number
2005061171
Lead Agency
Palmdale Water District
Document Title
Littlerock Reservoir Grade Control Project (Lake or Streambed Alteration Agreement No. 1600-2018-0077-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2018
Present Land Use
Local land use and zoning designations do not apply.
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0077-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Palmdale Water District as represented by Dennis LaMoreaux. Project intends to construct a subterranean grade control structure within the Littlerock Reservoir at Rocky Point. The purpose of the construction of the grade control structure is to ensure that sediment removal activities associated with the Littlerock Sediment Removal Project will not result in degradation of designated critical habitat for the arroyo toad (Anaxyrus californicus) located immediately upstream of Rocky Point. Construction of the structure will consist of grading and excavating both upland and streambed habitat, and cut and fill activities.

Contact Information

Name
Eric Chan
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Palmdale
Counties
Los Angeles
Cross Streets
National Forest System Lands
Zip
93552
Parcel #
Multiple
State Highways
I-5, SR 14, SR 138
Waterways
Littlerock Creek
Other Location Info
Community of Littlerock

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print