Ladd Associates Conditional Use Permit/Surface Mining Permit/Reclamation Plan

3 Documents in Project

Summary

SCH Number
2005042031
Lead Agency
Humboldt County
Document Title
Ladd Associates Conditional Use Permit/Surface Mining Permit/Reclamation Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/8/2009

Document Description
A Conditional Use Permit, Surface Mining Permit, Reclamation Plan and review of financial assurance cost estimates for a surface mining operation with a 15-year permit term. The site currently consists of a large sandstone outcrop, and the project proposes intermittent extraction of up to 100,000 tons per year upon demand. The projected economic life of the quarry is 30 years. The rock product is to be utilized for commercial rip rap. The site is surrounded by timberlands and ranch lands. Access to the site is via a private, unsurfaced road that connects to Alderpoint Road. The road will be extended several hundred feet to the quarry site, and will cross Hoagland Creek and an unnamed intermittent creek, both of which are tributaries of the Van Duzen River.

Contact Information
Anita Punla
Humboldt County Community Development Services
3015 H Street
Eureka, CA 95501-4484

Phone : (707) 268-3727
Fax : (707) 445-7446

Location

Counties
Humboldt
Cross Streets
Alderpoint Road / SR 36
Zip
95526
Total Acres
7
Parcel #
207-181-16, 19; 207-182-09
State Highways
SR 36
Waterways
Van Duzen River
Township
N
Range
3E
Section
15
Base
HM
Other Location Info
Bridgeville

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Humboldt County Planning Division 3015 H St Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search