Ninos Parkway Phase 2 Bridge (Streambed Alteration Agreement EPIMS Notification No. SAC- 35322-R2)

11 Documents in Project

Summary

SCH Number
2005012119
Lead Agency
City of Sacramento
Document Title
Ninos Parkway Phase 2 Bridge (Streambed Alteration Agreement EPIMS Notification No. SAC- 35322-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2023
Document Description
The project is limited to the construction of a pedestrian crossing over the B Drain Canal. The bridge will be approximately 68.5-feet long by 12-feet wide and will consist of a double box culvert facility with wing walls. The cast-in-place reinforced concrete double box culvert will be approximately 22.5-feet long, and 16-feet wide, with an interior height of 8.5 feet. Approximately 287 cubic yards of material will be excavated to install the box culvert with 328 cubic yards of material backfilled on top of the structure for the pedestrian crossing to convey. The bridge abutments will be constructed in the existing banks of the canal. The project site is highly turbulent due to the outfall of a storm drain pump station, a transition from lined to unlined channel, and a 90- degree bend in the B drain. Due to these factors Rock Slope Protection (RSP) will be placed in an 18-inch layer throughout the channel approximately 87 feet upstream (east) of the bridge crossing, totaling approximately 700 square feet. No riparian vegetation or native trees will be impacted by project activities. A temporary water diversion will be implemented within the project area to allow for channel access and demolition of a section of existing revetments.

Contact Information

Name
Ben Huffer
Agency Name
CALIFORNIA DEPARTMENT OF FISH &WILDLIFE
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Cross Streets
Southeast of the Interstate 80 and Truxel Road interchange
Zip
95834
Parcel #
225-0841-001-0000

Notice of Determination

Approving Agency
CALIFORNIA DEPARTMENT OF FISH & WILDLIFE
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
CDFW's Regional Office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.