Big Rock Creek Siphon Turnout

2 Documents in Project

Summary

SCH Number
2005011077
Lead Agency
Antelope Valley-East Kern Water Agency (AVEK)
Document Title
Big Rock Creek Siphon Turnout
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2010
Document Description
The project involves the necessary improvements to provide a maximum annual delivery of 1,700 AF or a maximum instantaneous flow rate of 10,000 gpm of AVEK's long-term water supply contracted Table A allotment obtained from the existing south Big Rock Creek Siphon blowoff structure to the edge of the Department of Water Resources right-of-way. The necessary improvements will be contained within approximately a 6,000 sf footprint and will include connection to the existing blowoff structure, ~130 linear ft of 20 inch diameter transmission piping, and a flow meter and metering vault. The water from this project will be for future use by the Scattaglia orchard filters and pumps, and to the Crystalaire golf course pond, located within the County of Los Angeles.

Contact Information

Name
Gwen Knittweis
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Palmdale
Counties
Los Angeles
Cross Streets
Crystalaire Drive / 165th Street East
Zip
93544
Total Acres
0.5
Parcel #
N/A
State Highways
N/A
Railways
N/A
Airports
Yes
Schools
N/A
Waterways
California Aqueduct
Township
5N
Range
9W
Section
29, 31
Base
SBBM
Other Location Info
Pearblossom
Other Information
Section: 32

Notice of Determination

Approving Agency
DWR
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print