Round Pond Winery / Use Permit #03529-UP
4 Documents in Project
Summary
SCH Number
2004122144
Lead Agency
Napa County
Document Title
Round Pond Winery / Use Permit #03529-UP
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2005
Present Land Use
Agriculture / AP (Agricultural Preserve) / AR (Agricultural Resource)
Document Description
Approval of a Use Permit to establish a new 20,000 gallon per year winery: (1) construct a 15,174 sq. ft. winery building with a 10,674 sq. ft. ground floor and 4,500 sq. ft. second story floor; (2) construct 900 sf mechanical building and pump house; (3) construct a 2,400 sq. ft. covered work area; (4) custom crushing activities (crushing, fermentation, barrel aging, and bottling) for up to four custom porducers and four alternating proprietors utilizing 50% of the total approved winery production capacity; (5) four full and three part-time employees; (6) 11 parking spaces; (7) tours and tasting by appointment only with a maximum of 90 visitors per week (not to exceed 15 visitors per day); (8) a marketing plan with 24 activities per year with a maximum of 30 people per event; (9) construction of a special design wastewater system (pressure distribution) requiring a permit; (10) construction of road improvements to Rutherford Road/SR 128.
Contact Information
Name
Naomi Beattie
Agency Name
Napa County
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Napa
Counties
Napa
Cross Streets
SR 29 / St. Helena Highway
Zip
94573
Total Acres
45.71
Parcel #
30-140-021 and 007
State Highways
29/128
Waterways
Napa River / Conn Creek
Township
7N
Range
5W
Section
Ruther
Base
8C
Other Location Info
Rutherford
Other Information
Acres (cont): Subject to LLA
Notice of Determination
Approving Agency
Napa County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.