Rockaway Miller Creek Restoration Project
2 Documents in Project
Summary
SCH Number
2004092057
Lead Agency
Sotoyome Resource Conservation District
Document Title
Rockaway Miller Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2005
Present Land Use
Agricultural/Rural residential
Document Description
Restoration of approximately 3/4 mile of Miller Creek near Geyserville by recontouring several spoil piles which were deposited along approximately 500 feet of the south bank of the creek by a prior owner, removing invasive exotic vegetation (including Himalaya blackberry, Scotch broom, French broom, and blue periwinkle), and revegetating both banks with native riparian vegetation. Spoil piles at the top-of-bank will be laid back to a maximum 2:1 slope. Other spoil piles within the flood plain area will be smoothed out, and compacted to create a more stable and natural landform. Once the spoil piles have been recontoured, the site wil be seeded with an erosion control mix and planted with native riparian tree and shrub species, including California wild rose, big-leaf maple, buckeye, madrone, Oregon ash, coast live oak, valley oak, black oak, and other appropriate species. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0744-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Kara Heckert, Sotoyome Resource Conservation District.
Contact Information
Name
Bill Cox
Agency Name
Sotoyome Resource Conservation District
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Sonoma
Cross Streets
Highway 128
Zip
95482
Parcel #
several
State Highways
128
Railways
Northwestern
Waterways
Russian River
Township
10N
Range
9W
Section
Unk.
Other Location Info
Geyserville
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.