Former Colton Manufactured Gas Plant Site

2 Documents in Project

Summary

SCH Number
2004081077
Lead Agency
Department of Toxic Substances Control
Document Title
Former Colton Manufactured Gas Plant Site
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2004
Document Description
The proposed project involves the remediation of contaminated soils associated with the operation of the former Manufactured Gas Plant (MGP) at the Colton site, which was in operation between 1912 and 1947 by Southern Counties Gas Company, a predecessor to The Gas Company. Remedial activities include the following: excavation and removal of contaminated soils; transport of contaminated soils to an off-site treatment facility; and backfilling of the site with clean soils. The site encompasses an area of approximately 8.5 acres, of which approximately 99,000 square feet (approximately 2.5 acres) will be excavated. The excavation depths range from approximately 1 to 6 feet below ground surface (bgs). The average depth of soils to be excavated is 4 feet bgs. The total amount of excavated soils is expected to be approximately 21,000 tons or 15,000 cubic yards. This would require approximately 840 truckloads. The proposed project would be temporary, lasting approximately 3 to 4 months. Once the contaminated soil is excavated, confirmation sampling will be conducted to determine if additional excavation is required. Following the positive results, the excavated area will be backfilled with clean soils to be hauled in from a nearby quarry, and the site would be restored to near existing conditions. The hauling operation is estimated to be completed in approximately 25-30 working days, with approximately 80 truck-trips of contaminated and clean soils entering and exiting the site daily.

Contact Information

Name
Anthony Espinoza
Agency Name
Department of Toxic Substances Control, EPA
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
Fogg Street
Zip
92324
Total Acres
8.5
Parcel #
163-281-31, -32, -29; 163-301-11
State Highways
I-10
Railways
Yes
Airports
None
Schools
Yes
Waterways
None
Township
1S
Range
4W
Section
29
Base
S.B.

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.