Delta Water Supply Project

12 Documents in Project

Summary

SCH Number
2003112060
Lead Agency
City of Stockton
Document Title
Delta Water Supply Project
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2005
Present Land Use
Agriculture, rights-of-way / Agriculture / Agriculture
Document Description
On April 18, 1996, the City of Stockton filed Application 30531 for a water right permit authorizing the appropriation of water diverted from the San Joaquin River for municipal and industrial purposes. The City's Delta Water Supply Project (DWSP) is a new supplemental water supply for the City's metropolitan area. The proposed total amount of water to be appropriated under originally filed Application 30531 was limited to 125,900 acre-feet per annum (afa), to be diverted at a maximum diversion rate not to exceed 317 cubic feet per second (at build-out in 2050). The water to be diverted from the source, San Joaquin River, will be: (a) treated wastewater discharged into the San Joaquin River at the City's Regional Wastewater Control Facility, and (b) additional amounts. The City proposes to appropriate treated wastewater discharged into the San Joaquin River pursuant to the provisions of Water Code section 1485, and to appropriate additional amounts under claim of seniority pursuant to Water code section 11460. The DWSP proposes to incrementally develop in phases the supplemental water supply that the City seeks to appropriate pursuant to Application 30531. During Phase 1, the City proposes to construct a new water intake facility in the San Joaquin River (POD #1 described under Application 30531), raw water and treated water transmission lines and a new water treatment plant capacity under Phase 1 development would be 30 million gallons per day (mgd), or 33,600 afa. Ultimately, by 2050, the new water treatment plant would be expanded to treat 160 mgd, which includes the maximum diversion applied for under Application 30531 of 125,900 afa.

Contact Information

Name
Victoria A. Whitney
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Parcel #
Various
State Highways
I-5, SR 12
Railways
UPRR
Airports
Kingdon
Schools
Bear Creek HS, John Muimuir ES, Elkhorn ES
Waterways
Middle River

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print