U&S Street In-Line Storage Project

2 Documents in Project

Summary

SCH Number
2003112001
Lead Agency
City of Sacramento
Document Title
U&S Street In-Line Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2004
Present Land Use
Transportation Corridor
Document Description
The Proposed Project/Action consists of constructing in-line storage capacity within the City's existing combined sewer system, and modifying the Sump 1A pumps. Specifically, approximately 800 feet of 54-inch Combined Sewer (CS) pipeline would be installed approximately 5 feet below surface, parallel to the existing combined sewer pipeline on S Street between 5th and 7th. Additionally, approximately 1,350 feet of 84-inch diameter pipe would be installed in U Street, 5-8 feet below the surface, parallel to the existing 84-inch CS. This pipe would extend from 3rd Street, where the microtunneled pipe ended to 5th Street. Concrete structures will be constructed at the connection to the existing sump 1A wet well, and at the 5th / U Street and at the 5th / S Street intersections. Finally, the installation of approximately 550 linear feet of 84-inch OD sewer would require microtunnelling beneath I-5.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
S between 5th and 7th an U between 5th and Front (under 15)
State Highways
I-5, I-80, I-50
Waterways
Sacramento River
Township
8
Range
4East
Other Information
Base: Mt Diablo Baseline & Meridian

Notice of Determination

Approving Agency
City of Sacramento Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.