San Diego State University (SDSU) / US Geological Survey (USGS) Laboratory
2 Documents in Project
Summary
SCH Number
2003101047
Lead Agency
City of San Diego
Document Title
San Diego State University (SDSU) / US Geological Survey (USGS) Laboratory
Document Type
NOD - Notice of Determination
Received
Posted
1/5/2004
Present Land Use
Community Commercial CC-5-5
Document Description
SDSU / US Geological Survey (USGS) Environmental Monitoring Laboratory - Phase I: Site Development Permit (SDP) 40-0750 to construct a 40,000 square foot research building on a 2.2 acre site. Phase I of this project consists of only the office portion of the lab; no in-water construction or wet lab operations would be constructed at this time. Approximately 99 on-site parking spaces would be provided. The project location is at 2392 Kincaid Road (APN 450-790-08) in the CC-5.5 zone of the Naval Training Center (NTC) Precise Plan in the Peninsula Community Plan, Airport Environs Overlay, Airport Approach Overlay Zone, State Coastal Commission, Council District 2. Applicant: San Diego State University Foundation, c/o Lou Haberkern.
Contact Information
Name
Cory Wilkinson
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Cross Streets
Harbor Drive & Kincaid
Parcel #
450-790-0800
Airports
Lindbergh Field
Schools
High Tech High & NTC
Waterways
San Diego Bay
Other Location Info
Nearest Community: Point Loma
Notice of Determination
Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.