Centennial Drive Evacuation Support Project

34 Documents in Project

Summary

SCH Number
2003082131
Lead Agency
University of California, Berkeley
Document Title
Centennial Drive Evacuation Support Project
Document Type
NOD - Notice of Determination
Received
Posted
10/17/2019
Document Description
UC Berkeley proposes to commence the Centennial Drive Evacuation Support Project (Project) from December 1, 2019, through January 15, 2020, consistent with the fuel management that was evaluated in the 2020 Long Range Development Plan Environmental Impact Report (SCH # 200308213). The Project comprises 33.3 acres in the Hill Campus and would involve fuel management activities within 100 feet of the edge of pavement depending on slope and other conditions along both sides of Stadium Rim Way and Centennial Drive. Over a six-week period, UC Berkeley would remove all trees, regardless of species type or maturity, located along and within 100 feet adjacent to either side of portions of Centennial Drive and Stadium Rim Way that are either unhealthy and determined by an arborist to be dead or in poor or fair condition or that are located so that in a fire they could fall across the road blocking vehicle access on Centennial Drive becoming a safety hazard.

Contact Information

Name
Wendy Hillis
Agency Name
University of California, Berkeley
Contact Types
Lead/Public Agency

Name
Agency Name
University of California, Berkeley
Contact Types
Project Applicant

Location

Cities
Berkeley
Counties
Alameda
Cross Streets
University of California, Berkeley

Notice of Determination

Approving Agency
University of California, Berkeley
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print