Ventura College Campus Master Plan

3 Documents in Project

Summary

SCH Number
2003061105
Lead Agency
Ventura County Community College District (VCCD)
Document Title
Ventura College Campus Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2004
Present Land Use
Community College/Single Family Residential/Parks - Open Space
Document Description
The project is a Campus Master Plan for Ventura College, which is intended to implement the Bond Measure S program, approved by the voters in March 2002, and to guide the long-term development of Ventura College through 2015. The Campus Master Plan identifies appropriate locations and design guidelines for the Bond Measure S projects on the Ventura College campus, as well as providing a guide for the future development of the campus beyond the expenditure of the Measure S bond funds. Enrollment at the College is forecasted to grow from the current (2002) 11,125 students to 11,873 in 2015. The current full-time students (FTES) enrollment of 4,066 is expected to increase to 4,720 FTES by 2015. The total campus building area is planned to expand by 25% from 465,408 sf to 580,412 sf, and the balance and mix of the various types of classrooms and other facilities would change to reflect current educational practices. Additionally, the Master Plan calls for the replacement of a number of buildings that have reached the end of their service life with more up-to-date facilities.

Contact Information

Name
Rich Magill
Agency Name
Ventura County Community College District
Contact Types
Lead/Public Agency

Location

Cities
Ventura
Counties
Ventura
Cross Streets
Telegraph Road and Day Road.
Zip
93003
Total Acres
112
State Highways
126
Schools
Ventura College
Other Location Info
San Buenaventura

Notice of Determination

Approving Agency
Ventura County Community College District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print