North Green Valley Interceptor Sewer Upgrade Project

3 Documents in Project

Summary

SCH Number
2003021068
Lead Agency
Leucadia County Water District
Document Title
North Green Valley Interceptor Sewer Upgrade Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Open space, community commercial and residential low-medium density.
Document Description
North Green Valley Interceptor consists of two parallel pipelines located in or adjacent to El Camino Real. The pipelines are approximately 6,700 feet (1.3 miles) in length and extend from Olivenhain Road to La Costa Avenue in the City of Carlsbad. The first pipeline was built in 1966 and the second was constructed in the early 1980s. In order to address issues elated to deficient capacity in the older pipeline, LCWD is proposing to divert some of the flows in the existing pipeline into a newer pipeline which can accommodate these flows. A total of 300 feet of new pipeline and one new manhole would be constructed to connect the two pipelines. In addition, LCWD proposes to repair 2,150 feet of pipeline that has been damaged or cracked as a result of tree root and groundwater infiltration using trenchless lining methods. Other project features include: conduct point repairs at five locations, and rehabilitate 23 manholes. Construction of the North Green Valley Interceptor Sewer Upgrade Project covered in this MND would take approximately two months to complete and is expected to begin in the fall of 2003. The objective of the proposed project is to provide continued service to existing customers, and to serve approved development anticipated by the cities of Carlsbad and Encinitas in their respective general plans.

Contact Information

Name
Mike Bardin
Agency Name
Leucadia County Water District
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad
Counties
San Diego
Cross Streets
El Camino Real between Olivehain & La Costa Ave.
Zip
92009
Total Acres
11.2
Parcel #
N/A (multiple)
State Highways
S-11
Schools
El Camino Creek Elementary School
Waterways
Encinitas Creek, San Marcos Creek, Batiquitos Lagoon
Township
13&14S
Range
4W
Section
35,14,
Other Information
Section: 11 Base: USGS7.5/ENCINITAS

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Fish and Wildlife, Marine Region, Department of Water Resources, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Department of Health Care Services (DHCS), California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Department of Health Care Services (DHCS), California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Waste Treatment:Other (Pipeline Repair)
Local Actions
Project Approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Septic System, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.