Tank Farm Road Bridge Silt Removal Project (ER 107-02)

3 Documents in Project

Summary

SCH Number
2003011076
Lead Agency
City of San Luis Obispo
Document Title
Tank Farm Road Bridge Silt Removal Project (ER 107-02)
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2003
Present Land Use
Conservation/Open Space
Document Description
A seasonal unnamed tributary to East Fork San Luis Obispo Creek flows through a bottomless concrete box culvert at the intersection of Tank Farm Road and Hollyhock Road in the City of San Luis Obispo. Sediment has accumulated in the culvert and has reduced the flow capacity of water in the creek. The proposed project would remove approximately 12 cubic yards of sediment from the box culvert to restore the original capacity of the culvert. Sediment would be removed to a depth equal to the channel bottom immediately upstream from the culvert, leaving a low-flow channel to facilitate flow through the culvert. A minimal amount of riparian vegetation would be trimmed to allow access to the project site, and invasive vegetation would be removed from the site. The project is necessary to restore the original capacity of the culvert in the event that high flows occur during upcoming winter storms.

Contact Information

Name
Matt Horn
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Tank Farm Road and Holly hock
Parcel #
053-085-026
State Highways
Broad Street, Highway 227
Railways
Southern Pacific
Airports
San Luis Obispo
Waterways
East Fork San Luis Creek
Township
30S
Range
12E
Section
12
Base
MD

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.