City of Hope Master Plan Modification (File No. 00859909-PMPC)

38 Documents in Project

Summary

SCH Number
2002101020
Lead Agency
City of Irvine
Document Title
City of Hope Master Plan Modification (File No. 00859909-PMPC)
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2022
Document Description
The master plan modification consists of the construction and operation of a 164,158-square-foot in-patient hospital located adjacent to existing Building 5 (City of Hope outpatient medical office). Additionally, the project also proposes expanding the service yard, and redesigning the approved parking structure by eliminating 34 full-size parking spaces and replacing them with 58 compact parking spaces.

Contact Information

Name
Hernan DeSantos
Agency Name
City of Irvine
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Kory Lynch
Agency Name
Five Point Communities, on behalf of City of Hope
Job Title
Senior Vice President Engineering and Entitlements
Contact Types
Project Applicant

Location

Cities
Irvine
Counties
Orange
Regions
Citywide, Countywide, Southern California, Statewide
Cross Streets
Barranca Parkway and Alton Parkway
Zip
92626
Total Acres
13.4
Jobs
625
Parcel #
59018118
State Highways
Interstate 5 Freeway
Railways
OC Metrolink RailRoad
Airports
N/A
Schools
Portola High School
Waterways
N/A

Notice of Determination

Approving Agency
City of Irvine Planning Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
cityofirvine.org/planningcommission

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Technical Memorandum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print