Former Lake Elsinore Manufactured Gas Plant Site

3 Documents in Project

Summary

SCH Number
2002091078
Lead Agency
Department of Toxic Substances Control
Document Title
Former Lake Elsinore Manufactured Gas Plant Site
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2002
Present Land Use
Zoned Tourist/Commercial (TC)
Document Description
Pursuant to authority granted under Chapter 6.8, Division 20, California Health and Safety Code (H&SC), the Department of Toxic Substances Control (DTSC) is proposing to approve a draft Removal Action Workplan (RAW) for remediation of polyaromatic hydrocarbons (PAHs), volatile organic compounds (VOCs), some metals, and cyanide contaminated soil at the former Gas Manufacturing Plant site located at 227 Flint Street, Lake Elsinore, CA. The draft RAW was prepared in accordance with H&SC Section 25356.1. If approved, the RAW would allow for the following activities: Excavation of contaminated soil, stockpiling of soil for confirmation sampling, transporting excavated contaminated soil to an off-site facility for disposal or treatment, by truck, backfill of excavation area following final confirmation sampling with clean fill material imported from outside location.

Contact Information

Name
Pradip Desai
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Riley Street & Pottery Street
Zip
92530
Total Acres
2.8
Parcel #
374-062-004,008,011,012,013,014
State Highways
I-15
Airports
Skylark
Schools
Elsinore Elementary School
Waterways
Lake Elsinore Outlet Channel/Lake Elsinore
Township
6S
Range
4W
Section
6
Base
SB

Notice of Determination

Approving Agency
Department of Toxic Substance Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.