Sabre Springs Transit Center

3 Documents in Project

Summary

SCH Number
2002011064
Lead Agency
Metropolitan Transit System (MTS)
Document Title
Sabre Springs Transit Center
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2003
Present Land Use
Land Use Designation: Specialty Commercial Zoning: Commercial Present Use: Vacant/Park-and-ride lot
Document Description
The proposed project consists of the development of a 5.64-acre transit center that would include ten bus bays, an approximately 167-vehicle park-and-ride lot, a kiss and ride drop-off area, transit-related furnishings including shelters and benches and an access road connecting to a proposed Direct Access Ramp (DAR) in conjunction with the California Department of Transportation's (Caltrans) Interstate I-15 Managed Lanes Project. The DAR would provide direct access to and from I-15 HOV lanes and is not part of the proposed project. Landscaping would be installed along the site perimeter and in select areas within the proposed facility. Overhead lighting would be installed, where appropriate, to provide adequate lighting during early morning and nighttime operations. A retaining wall would be constructed along the north side of the proposed access road from the transit center to the DAR. Proposed circulation improvements would include provision of two vehicular access points (one from Sabre Springs Parkway and another from Evening Creek Drive), installation of a traffic signal interconnect system between Ted Williams Parkway and Evening Creek Drive, and provision of several vehicular travel lane configurations at the proposed access points and within the proposed transit center.

Contact Information

Name
Kathy Donnelly
Agency Name
Metropolitan Transit Development Board
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Sabre Springs Parkway and Evening Creek Drive
Total Acres
6.76
Jobs
10
State Highways
I-15

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.